Top News
» » » Armenian Nuclear Power Plant re-connected to grid after major repair

Armenian Nuclear Power Plant re-connected to grid after major repair

18-10-2021, 12:21 Armenia » Economy
Armenian Nuclear Power Plant re-connected to grid after major repair


18 October 2021, 12:21 - NovostiNK
After a 141-day planned preventive repair the Armenian Nuclear Power Plant has been re-launched and re-connected to the power grid.

Over 600 specialists from Armenia, Russia, Belarus, Ukraine, Croatia, Czech Republic, Slovakia and elsewhere took part in the repair work, the NPP operator said.

The repair will contribute to extending the lifecycle of the 2nd power unit, as well as the increase of the safety level.


Armenpress


Turkey ready to buy Russian latest military aircraft, if US refuses to sell F-16 fighters
Turkey ready to buy Russian latest military aircraft, if US refuses to sell F-16 fighters
Turkey is still ready to consider purchasing Russian-made Su-35 and...
Armenia, Iran to set up special commission to study Araks River pollution
Armenia, Iran to set up special commission to study Araks River pollution
One of the key issues during my recent visit to Armenia was the Araks...
Armenian companies will get cheaper loans as a result of S&P Global rating – Pashinyan
Armenian companies will get cheaper loans as a result of S&P Global rating – Pashinyan
The assigning of a rating by the S&P Global Ratings to Armenia for...

:*
E-Mail:
:
Bold Italic Underline Strike | Align left Center Align right | Insert smilies Insert link URLInsert protected URL Select color | Add Hidden Text Insert Quote Convert selected text from selection to Cyrillic (Russian) alphabet Insert spoiler
: *